Quote:
Originally Posted by clowns789 View Post
The problem with levels 27-30 that you outlined is that it encourages the two P-1 stages to be separate and thus many of the second stages will likely be done on different systems than the first stages. I believe after Level 26 the project should split into a "wide" search for those who want smaller GPU work units to factor more exponents to lower bit depths, and a "deep" search with P-1 and PRP.

I think P-1 stages could be assigned separately, although it shouldn't be encouraged by the way the level system is structured; in other words, it shouldn't encourage participants to run 27 first stages before doing any second stages.
Well, first of all that assumes problems created by a level of success and interest at large work units that has not been much in evidence lately. Certainly not other than yours or mine.

Dozens of P-1 stage 1 would imply dozens of TF to 92 first.
I expect < 10 TF to 92 bits in 2022, perhaps <5.
And probably no more P-1 stage 1 or 2 than 4 in 2022.

The OBD subproject was at level 21.something IIRC when you took one exponent to 91 bits. There are still millions of OBD prime exponents available at 84 bits or lower. Other participants are running some on lower bit levels, despite the current levels system ignoring those.

PRP of OBD is such a large job that I anticipate none done through 2026. Probably longer. (If Mihai added sufficiently bigger fft lengths next month to gpuowl v7.x, it would take to about 2027 to complete OBD PRP / P-1 combined on Radeon VII. And who would dedicate several years of a fast GPU to one PRP? Who would dedicate a powerful multicore CPU to Mlucas on OBD for decades?)
Attached Files
File Type: pdf obd progress.pdf (54.8 KB, 12 views)

Last fiddled with by kriesel on 2021-11-05 at 02:35
kriesel is offline   Reply With Quote
Old 2021-11-07, 03:47   #13
clowns789
 
clowns789's Avatar
 
Jun 2003
The Computer

18F16 Posts
Default

Quote:
Originally Posted by kriesel View Post
Well, first of all that assumes problems created by a level of success and interest at large work units that has not been much in evidence lately.
Fair enough. Certainly when the level system was created 17 years ago, P-1 and PRP were not considered, not to mention the latter didn't exist!

Luckily, we have some time to figure it out, and the mlucas benchmarking should help. As you've mentioned before, this work will likely aid in future programming efforts even if it is ruled that P-1 and PRP should be done consecutively on one machine.
clowns789 is offline   Reply With Quote
Reply

Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
ECM probabilities and bit levels mnd9 PrimeNet 20 2019-11-01 16:33
Racism or low light levels or...? jasong jasong 2 2016-09-25 05:07
Missing bit levels? NBtarheel_33 Data 6 2016-05-31 15:27
skipped bit levels tha PrimeNet 151 2016-03-17 11:38
Recommended TF bit levels for M(>10^8) NBtarheel_33 Math 19 2008-11-03 17:19

All times are UTC. The time now is 07:27.


Tue Nov 30 07:27:51 UTC 2021 up 130 days, 1:56, 0 users, load averages: 0.67, 0.81, 0.91

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2021, Jelsoft Enterprises Ltd.

This forum has received and complied with 0 (zero) government requests for information.

Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation License, Version 1.2 or any later version published by the Free Software Foundation.
A copy of the license is included in the FAQ.