#1 |
"Nuri, the dragon :P"
Jul 2016
Good old Germany
15668 Posts |
![]()
I´m working for an germany company. I´m going on assembly, so I´m always moving around Germany (hired for international assembly...but...who knows).
Next job will start at 16.01.2017. Lenght 4 weeks. Shut-down from oven #2 at RWE Waste incinerator Cologne-Hurth (Chempark Hurth). Oven #2 city waste. Last fiddled with by MisterBitcoin on 2018-03-29 at 09:37 |
![]() |
![]() |
![]() |
#2 |
"Nuri, the dragon :P"
Jul 2016
Good old Germany
2×443 Posts |
![]()
I forgot yesterdays entry...
Day 1: Nothing really to do. My work area (ash removal funnel) is confined space. O2-tests are needed. Day 2: Work granted. "Remove all damaged cooling water pipes", sounds easy. You should better be an ape. Its 1,5 meters above your head and extremely dirty from remaining ash. Get your masks and overall on. :) All over 35 pipes from 4 tunnels removed, a lot of work. |
![]() |
![]() |
![]() |
#3 |
"Nuri, the dragon :P"
Jul 2016
Good old Germany
2×443 Posts |
![]()
Well...never mind
Day 3. Not really much happened. We waited for about 4 hours for welders. After welding was done I got an other task. I was removing some metal parts from some stuff. Day 4 (today) Removed some more pipes from the funnels. |
![]() |
![]() |
![]() |
#4 |
"Nuri, the dragon :P"
Jul 2016
Good old Germany
2·443 Posts |
![]()
Day 5.
Entering the funnel again, installed a lot of steel pipes. Saturday and Sunday is free. So only a 50 hour week. :) Last fiddled with by MisterBitcoin on 2017-02-27 at 00:26 |
![]() |
![]() |
![]() |
#5 |
"Nuri, the dragon :P"
Jul 2016
Good old Germany
2·443 Posts |
![]()
Day 6.
It was a typical Monday. Very relaxed working. Our main topics were already completed last week. So, nothing special to say about it. :/ |
![]() |
![]() |
![]() |
#6 |
"Nuri, the dragon :P"
Jul 2016
Good old Germany
2×443 Posts |
![]()
Day 7
We changed a few pipes from the cooling water system. Why do they use 3/4" instead of DIN EN-stuff? nvm, relaxed day. |
![]() |
![]() |
![]() |
#7 |
"Nuri, the dragon :P"
Jul 2016
Good old Germany
2·443 Posts |
![]()
Day 8
A special day...not. We repaired a dozen 3/4" valves and installed them in the cooling water system. |
![]() |
![]() |
![]() |
#8 |
"Nuri, the dragon :P"
Jul 2016
Good old Germany
2×443 Posts |
![]()
EEW Oven I is ready for operation.
We got some work in the chemiepark Hürth, for BayerCropSciene. I´m working in PSM 4, an facility for MPE, MPS and MPC. Today we worked on an MPC (Methlydichlorphosphon) DSV. Last fiddled with by MisterBitcoin on 2017-02-27 at 00:17 |
![]() |
![]() |
![]() |
#9 |
"Nuri, the dragon :P"
Jul 2016
Good old Germany
2×443 Posts |
![]()
It´s have been some time since last reply here. :)
I´m now working in the PSM 2 shutdown for BayerCropScience. Last fiddled with by MisterBitcoin on 2017-02-27 at 00:17 |
![]() |
![]() |
![]() |
#10 |
"Nuri, the dragon :P"
Jul 2016
Good old Germany
15668 Posts |
![]()
I´ve been thinking of using this thread to post some status reports for my different projects I participate.
You might find anythink in here. Lets start...at some point. Term 593#/210+7# fully factored. Found P26 with yafu, co-factor is P214. Term (4288^66-4422^64) fully factored. Much small factors, found P10 and QS did the rest on the C70. Term 28^7#%100^5!+47 fully factored. Two P24 found with ECM, co-factor of 193 digit is prime. Last fiddled with by MisterBitcoin on 2018-03-29 at 10:38 |
![]() |
![]() |
![]() |
#11 |
"Nuri, the dragon :P"
Jul 2016
Good old Germany
2×443 Posts |
![]()
Term 12^222+47 fully factored. Found P12 and P22, co-factor is prime.
Term 100^5!+6983 fully factored. Found P28, co-factor is prime. Term 113^108*2^73+1 fully factored. Found P24, co-factor is prime. Also 3 other numbers (above 240 digits) were fully factored, but they had no short formula. Last fiddled with by MisterBitcoin on 2018-03-30 at 19:35 |
![]() |
![]() |
![]() |
Thread Tools | |
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
Whatever Joey does blog | jvang | jvang | 107 | 2019-04-05 08:21 |
How to calculate work/effort for PRP work? | James Heinrich | PrimeNet | 0 | 2011-06-28 19:29 |
The Update Blog | ltd | Prime Sierpinski Project | 48 | 2010-12-28 13:24 |
Puzzle Blog | grandpascorpion | Puzzles | 0 | 2008-07-07 22:53 |
Project Tools & Blog | Xyzzy | Lounge | 6 | 2007-09-05 16:27 |