![]() |
![]() |
#67 |
"TF79LL86GIMPS96gpu17"
Mar 2017
US midwest
2·3·1,097 Posts |
![]()
and M57747401 likely to complete within a day.
Get ready to celebrate. Last fiddled with by kriesel on 2021-09-24 at 18:01 |
![]() |
![]() |
![]() |
#68 |
Xebeche
Apr 2019
🌺🙏🌺
5·89 Posts |
![]() |
![]() |
![]() |
![]() |
#69 |
"TF79LL86GIMPS96gpu17"
Mar 2017
US midwest
2×3×1,097 Posts |
![]()
57747401 done, lowest remaining unchanged. A fine example of how lowest remaining does not always reflect progress well, sometimes not at all. Smallest remaining delta just jumped from 32 to 340.
Last fiddled with by kriesel on 2021-09-24 at 23:02 |
![]() |
![]() |
![]() |
#70 |
"TF79LL86GIMPS96gpu17"
Mar 2017
US midwest
2×3×1,097 Posts |
![]()
12 DC to finish, and a cert. Certs typically complete within a day. One DC is a bit overdue for expiration and reassignment. The other 11 DC are all recently reassigned to Cat0-qualified fast reliable systems, reporting in recently.
Estimated completions for those range from today 2021-09-25 to 2021-10-01. Average indicated ETA is ~3 days (2021-09-28) The laggard for expiration and reissue likely expires and reissues today and completes by ~2021-10-03. Last fiddled with by kriesel on 2021-09-25 at 12:51 |
![]() |
![]() |
![]() |
#71 |
"TF79LL86GIMPS96gpu17"
Mar 2017
US midwest
2×3×1,097 Posts |
![]()
12 (11 DC 1 cert) remain; 57760333 completed; smallest remaining delta 582, average 12905.
Last fiddled with by kriesel on 2021-09-25 at 14:10 |
![]() |
![]() |
![]() |
#73 |
Jul 2003
Behind BB
2×953 Posts |
![]()
Only 8 left now. How often are triple-checks required?
|
![]() |
![]() |
![]() |
#74 |
"TF79LL86GIMPS96gpu17"
Mar 2017
US midwest
2×3×1,097 Posts |
![]()
That changed quickly. Lingering cert cleared, and 2 LL DC. MP#48* loses the * projected ~2021-10-01 by alternate method.
Extrapolating a linear fit through the various projections from M56 history gives a solution for convergence (date of projection, matching date projected) as 2021-09-30 02:45 UTC. I don't recall there being any seen in previous final going to milestones. Cat0 qualified systems are pre-screened to be fast and reliable for the previous 120 days. The strategic double and triple check thread sweeps the TC needs out of the way earlier. Overall, TC rate is ~2-4% per exponent, 1-2% per LL test. (Much higher if there's an error code recorded.) It varies depending on exponent size, system speed, whether the system has ECC ram, and whether it runs software with Jacobi check included. All 8 now remaining have nonzero shift count first LL tests with no error codes indicated. Chance of a TC being needed somewhere in the last 8 is slim but nonzero, ~12% chance or less of one TC, <2% of 2 or more. If whoever got a hypothetical TC had a Radeon VII they could move it and complete it in 7 hours. Last fiddled with by kriesel on 2021-09-26 at 15:06 |
![]() |
![]() |
![]() |
#76 |
"TF79LL86GIMPS96gpu17"
Mar 2017
US midwest
2·3·1,097 Posts |
![]()
Probably two more clear in the next day; all by ~2021-10-02. Average delta 25811.
Last fiddled with by kriesel on 2021-09-27 at 13:29 |
![]() |
![]() |
![]() |
#77 |
"TF79LL86GIMPS96gpu17"
Mar 2017
US midwest
2·3·1,097 Posts |
![]()
Two more will complete soon. All are progressing.
|
![]() |
![]() |
![]() |
Thread Tools | |
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
Let's finish primality verification through Mp#49*, M(74 207 281) | firejuggler | Marin's Mersenne-aries | 68 | 2022-03-24 18:44 |
Mission Creep | davieddy | PrimeNet | 14 | 2011-12-10 20:55 |
Doing more about LL test verification | jasong | Software | 13 | 2010-03-10 18:53 |
Mission Accomplished | garo | Soap Box | 13 | 2009-01-22 20:10 |
First mission | GP2 | Completed Missions | 2 | 2003-09-28 23:16 |