mersenneforum.org  

Go Back   mersenneforum.org > Great Internet Mersenne Prime Search > PrimeNet

Closed Thread
 
Thread Tools
Old 2004-08-24, 15:04   #1
Matthias C. Noc
 
Matthias C. Noc's Avatar
 
Dec 2003

2410 Posts
Question Stage 1 and stage 2 tests missing

Hi,

I’ve a small problem. It seems that for my current exponent no Stage 1 and Stage 2 tests were run. It started directly with the LL-test. I’ve no other exponent in the pipe and even deleting the variables

OnlyRunStage2WithMaxMemory
SkipTrialFactoring
SequentialWorkToDo

didn’t helped. Are the stage1 and 2 tests no longer part of the test or has somebody else run these tests on my exponent?
Matthias C. Noc is offline  
Old 2004-08-24, 15:45   #2
Uncwilly
6809 > 6502
 
Uncwilly's Avatar
 
"""""""""""""""""""
Aug 2003
101×103 Posts

2×3×52×73 Posts
Default

What expo do you have? Maybe somebody did P-1 it and then returned it. If it is a D-C, there are a group that tries to make sure they all get P-1'ed by machines with more memory.
Uncwilly is online now  
Old 2004-08-24, 15:55   #3
Matthias C. Noc
 
Matthias C. Noc's Avatar
 
Dec 2003

23×3 Posts
Default

Thanks! The exponent is in the 1965xxxx range. For my stage 1 and 2 tests 512 MB RAM would be available.
Matthias C. Noc is offline  
Old 2004-08-24, 16:13   #4
nfortino
 
nfortino's Avatar
 
Nov 2003

2458 Posts
Default

With an exponent that small, someone almost certainly did the p-1 test, and then let it expire before finishing the LL test. If you are really worried about it, you can go to your personal status page and check the fact bits number. If it is 67, the p-1 has already been done.
nfortino is offline  
Old 2004-08-25, 15:27   #5
Matthias C. Noc
 
Matthias C. Noc's Avatar
 
Dec 2003

23·3 Posts
Default

Okay, somebody has done the trial factoring to 67 bit (if that is replacing the stage 1 test), but what is with stage 2?
Matthias C. Noc is offline  
Old 2004-08-25, 15:42   #6
axn
 
axn's Avatar
 
Jun 2003

2·7·389 Posts
Default

Your exponent would have been trial factored to 66 bit. When P-1 was completed on it, the server marked it as if it has been trial factored to 66.5 bits. But in the reports, it will show up as 67 bits.

Stage 1 and Stage 2 are both part of the P-1 calculation - the server doesn't distinguish between these two stages, and the client only reports the P-1 result when both stages are completed.
axn is offline  
Closed Thread

Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
How to use prime95 for stage 1 & GMP-ECM for stage 2 Prime95 Lone Mersenne Hunters 118 2022-07-04 18:19
Stage 1 with mprime/prime95, stage 2 with GMP-ECM D. B. Staple Factoring 2 2007-12-14 00:21
Need help to run stage 1 and stage 2 separately jasong GMP-ECM 9 2007-10-25 22:32
Stage 2 P-1 already done or never done? Unregistered Software 5 2005-01-19 21:02
P-1 Stage 2 dave_0273 Software 4 2004-04-08 13:06

All times are UTC. The time now is 18:47.


Tue Mar 28 18:47:03 UTC 2023 up 222 days, 16:15, 0 users, load averages: 0.96, 1.05, 0.96

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2023, Jelsoft Enterprises Ltd.

This forum has received and complied with 0 (zero) government requests for information.

Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation License, Version 1.2 or any later version published by the Free Software Foundation.
A copy of the license is included in the FAQ.

≠ ± ∓ ÷ × · − √ ‰ ⊗ ⊕ ⊖ ⊘ ⊙ ≤ ≥ ≦ ≧ ≨ ≩ ≺ ≻ ≼ ≽ ⊏ ⊐ ⊑ ⊒ ² ³ °
∠ ∟ ° ≅ ~ ‖ ⟂ ⫛
≡ ≜ ≈ ∝ ∞ ≪ ≫ ⌊⌋ ⌈⌉ ∘ ∏ ∐ ∑ ∧ ∨ ∩ ∪ ⨀ ⊕ ⊗ 𝖕 𝖖 𝖗 ⊲ ⊳
∅ ∖ ∁ ↦ ↣ ∩ ∪ ⊆ ⊂ ⊄ ⊊ ⊇ ⊃ ⊅ ⊋ ⊖ ∈ ∉ ∋ ∌ ℕ ℤ ℚ ℝ ℂ ℵ ℶ ℷ ℸ 𝓟
¬ ∨ ∧ ⊕ → ← ⇒ ⇐ ⇔ ∀ ∃ ∄ ∴ ∵ ⊤ ⊥ ⊢ ⊨ ⫤ ⊣ … ⋯ ⋮ ⋰ ⋱
∫ ∬ ∭ ∮ ∯ ∰ ∇ ∆ δ ∂ ℱ ℒ ℓ
𝛢𝛼 𝛣𝛽 𝛤𝛾 𝛥𝛿 𝛦𝜀𝜖 𝛧𝜁 𝛨𝜂 𝛩𝜃𝜗 𝛪𝜄 𝛫𝜅 𝛬𝜆 𝛭𝜇 𝛮𝜈 𝛯𝜉 𝛰𝜊 𝛱𝜋 𝛲𝜌 𝛴𝜎𝜍 𝛵𝜏 𝛶𝜐 𝛷𝜙𝜑 𝛸𝜒 𝛹𝜓 𝛺𝜔