mersenneforum.org  

Go Back   mersenneforum.org > Prime Search Projects > Prime Sierpinski Project

Reply
 
Thread Tools
Old 2007-04-11, 10:49   #1
Chino112
 
Chino112's Avatar
 
Mar 2006

238 Posts
Default Stats Milestone - NEW

Quote:
Let's propose new milestones:

1. PRP all candidates below 4M
2. Total untested <1M
3. Sieve to 400 trillion
4. Double check to 1M
5. Find one more prime if possible

1. 12 thousand PRPs to go until we reach this. only 274 until done all <3.5M

2. total untested at 1.21M

3. since reservations have just past 550T, a much higher target needs to be set. 750T?

4. no double checking at present

5. a constant, no?


so what about

1. PRP all candidates below 4M
2. Total untested <1M
3. Sieve to 750 trillion
4. Find a prime
Chino112 is offline   Reply With Quote
Old 2007-04-13, 20:52   #2
Citrix
 
Citrix's Avatar
 
Jun 2003

1,579 Posts
Default

Let's propose new milestones:

1. PRP all candidates below 5M
2. Total untested <1.2M
3. Sieve to 750 trillion
4. Double check to 1M
5. Find one more prime if possible (I think there is one under 5M)

I think these milestones are more realistic. Though, I don't know if we need to double check to 1M, right now.


Citrix is offline   Reply With Quote
Old 2007-04-14, 07:07   #3
ltd
 
ltd's Avatar
 
Apr 2003

14048 Posts
Default

When i look at the error rates we have at the moment i see no need for any double check effort at the moment.
We should wait until we have sieved at least to 750T or even to 1000T before thinking about double checking on a bigger scale.

Lars
ltd is offline   Reply With Quote
Old 2007-04-16, 18:48   #4
VJS
 
VJS's Avatar
 
Dec 2004

29910 Posts
Default

I would also add bring prp upto a level of 6-7M before dc.

At that point I would select one or two k's and simply double check those to 5M first before starting a whole DC senario.
VJS is offline   Reply With Quote
Old 2007-04-28, 08:31   #5
ltd
 
ltd's Avatar
 
Apr 2003

22·193 Posts
Default

Another mini milestone passed.

We have less then 10000 test under n=4Mil.

Thanks to all contributors that gave the project such a boost in the last weeks.

Lars
ltd is offline   Reply With Quote
Old 2007-05-28, 07:41   #6
hhh
 
hhh's Avatar
 
Jun 2005

373 Posts
Default

Everything below 3M has been LLRed.

And BlisteringSheep has taken over the #1 in sieving, pushing Brucifer back to #2, which took quite some time, BTW.

Congratulations! H.
hhh is offline   Reply With Quote
Old 2007-06-22, 02:56   #7
Citrix
 
Citrix's Avatar
 
Jun 2003

62B16 Posts
Default

Approaching untested tests <1.2 M left. (Should reach there in 1-2 days)

Congratulations and good work guys. Keep it up.

(Waiting for Geoff to implement the improved sieve, so we can sieve faster and reach the goals before the end of the year)
Citrix is offline   Reply With Quote
Old 2007-06-22, 19:22   #8
VJS
 
VJS's Avatar
 
Dec 2004

4538 Posts
Default

I also had one of my slower computers working on DC with the old prp client.

Perhaps we should change that DC to 1M to DC all old prp tests. It's about the same accomplishment.
VJS is offline   Reply With Quote
Old 2007-07-19, 11:57   #9
ltd
 
ltd's Avatar
 
Apr 2003

22×193 Posts
Default

New small milestone.

Today the first test with n>=4Mil was handed out.

And the winner is SB2.
ltd is offline   Reply With Quote
Old 2007-07-19, 15:15   #10
hhh
 
hhh's Avatar
 
Jun 2005

373 Posts
Default

"At the laundry there is this slot machine... you put in a dollar, and you can win 4 quarters. I win every time! "

Brian Griffin
hhh is offline   Reply With Quote
Old 2007-10-29, 15:12   #11
Joe O
 
Joe O's Avatar
 
Aug 2002

3×52×7 Posts
Default

Quote:
3. Sieve to 750T
Less than 25T reserved but not complete.
8T not yet reserved.
Looks doable!
Attached Thumbnails
Click image for larger version

Name:	GP_GAPLIST_700T-725T.png
Views:	160
Size:	7.7 KB
ID:	1994  

Last fiddled with by Joe O on 2007-10-29 at 15:59
Joe O is offline   Reply With Quote
Reply

Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Another milestone! tcharron PrimeNet 3 2013-08-29 06:44
Another milestone frmky Msieve 7 2012-04-25 22:12
New Milestone opyrt Prime Sierpinski Project 65 2010-10-06 13:18
CSVs for stats available + New combined stats opyrt Prime Sierpinski Project 3 2010-05-31 08:13
Stats milestone Footmaster Prime Sierpinski Project 64 2006-10-30 18:36

All times are UTC. The time now is 15:52.

Tue Apr 20 15:52:55 UTC 2021 up 12 days, 10:33, 1 user, load averages: 2.25, 2.45, 2.32

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2021, Jelsoft Enterprises Ltd.

This forum has received and complied with 0 (zero) government requests for information.

Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation License, Version 1.2 or any later version published by the Free Software Foundation.
A copy of the license is included in the FAQ.