I just ran some quick calcuations to try to estimate when we can get the server dried out--and I came up with 6 AM tomorrow morning EDT (10 AM GMT). (I'll be leaving the house at ~5 AM EDT, so I wouldn't even be able to scramble and get it done right before I leave.)

So, we either have to massively increase what we've got on port 8000 ASAP (not too feasible--if only Beyond's machines weren't locked up with stress testing!), or just wait until I get back from vacation to have the results processed. Gary, would it be a problem if the results had to wait until the 20th? It looks like they may have to, given the looks of things.