Quote:
Originally Posted by techn1ciaN
but don't plan to do them more than occasionally until GIMPS is done with double-checking. I'll switch to PRP-DC if LL DCs run out before that point.
|
We are looking at the 2030-2032 time frame for all the DC's to get done. DC's can be run as PRP with certs, even if the FTC was an LL. Ken will obviously have an opinion about that.