View Single Post
Old 2013-09-19, 00:44   #71
RichD
 
RichD's Avatar
 
Sep 2008
Kansas

52·131 Posts
Default c162

New counts are:

>780 @ 11e7
>200 @ 26e7

I used the -v switch to calculate the ratio between curves in ECM. t55 requires
11e7 @ 17884 x1
26e7 @ 7650 x2.34
43e7 @ 4958 x3.61

If I followed the thread and added the numbers properly we have at:
11e7 2250 + 2172 + 700 + 780 = 5902 x1 = 5902
26e7 1931 + 217 + 200 = 2348 x2.34 = 5494
43e7 453 = 453 x3.61 = 1635
Grand total (so far) of 13031
of which 4/5 of 17884 (or 14.3K) is needed.

I'll let mine run through the night and request a poly.
I may even run a few dozen @ 85e7 to flush out a near miss.
RichD is offline   Reply With Quote